MRP & Production Scheduling
Constraint-based MRP with real-time work-center load balancing, finite scheduling, and automated purchase requisition generation - reacting to demand changes within minutes, not overnight batch runs.
Eliminate production bottlenecks, close work orders on time, and know your true cost-of-goods before the month ends. VOIITS connects MRP, shop-floor execution, and financial costing in real time - giving plant managers and CFOs the same single source of truth.
The Challenge
Each one handled out of the box - no spreadsheets, no workarounds.
One scheduling engine eliminates idle machines and WIP pile-ups.
Approved ECNs instantly update orders, POs, and inspection plans - no lag.
MRP auto-generates POs from live demand - ending both overstock and stockouts.
Full lot-and-serial traceability in seconds - auditors get the complete picture instantly.
Capabilities
Integrated production, quality, and cost-accounting modules purpose-built for discrete and mixed-mode manufacturers.
Constraint-based MRP with real-time work-center load balancing, finite scheduling, and automated purchase requisition generation - reacting to demand changes within minutes, not overnight batch runs.
Digital work orders with barcode-driven labor and material reporting, real-time OEE dashboards, and machine downtime capture to close the loop between execution and planning.
In-process inspection gates, nonconformance reporting, CAPA workflows, and first-article inspection records - all linked to the work order for full traceability.
Standard cost roll-up, actual cost capture at the work order level, and automated variance analysis across material, labor, and overhead - closing production costs the same day the order ships.
How it works
Sales, planning, production, and finance working from the same data.
Configure-to-order quoting feeds straight into MRP and capacity planning.
Finite scheduling and paperless shop-floor execution keep lines moving.
Real-time WIP, lot/serial genealogy, and in-line quality control.
Fulfillment, FTA-compliant invoicing, and live job costing - actuals versus quote.
Connected Modules
One platform - switch on the modules that matter to your operation, fully integrated.
FAQ
The things growing UAE teams ask us most before getting started.
Most UAE manufacturers in that range go live on Finance, Inventory, Procurement, and Production within 12 to 16 weeks using VOIITS phased deployment. HR, Payroll, and CRM follow in a second wave 4-6 weeks later, with a dedicated consultant on-site during configuration and data-migration sprints.
Yes. VOIITS provides structured migration templates for item masters, multi-level BOMs, vendor records, open purchase orders, and customer orders. Parallel-validation runs catch discrepancies before cutover, and historical archives can be retained as read-only or imported as opening balances.
Yes. Items can be individually flagged as MTO, MTS, or assemble-to-order, and the planning engine runs all three modes concurrently in the same facility. MTO sales orders drive work orders directly, while MTS items are replenished by MRP min/max or forecast logic.
VOIITS offers a touch-optimised terminal interface on ruggedised tablets or fixed kiosks. Operators scan barcodes or QR codes to clock jobs, log consumption, record downtime, and submit inspection results - posting to production orders in real time so planners always see current WIP costs and completion percentages.
The VOIITS AMC includes unlimited bug-fix patches, minor upgrades, and regulatory releases aligned with UAE FTA VAT requirements, plus SLA-backed support portal access. AMC is quoted as a percentage of your licence value, and cloud-hosted customers receive automatic zero-downtime updates.
Yes. VOIITS uses a configuration-first architecture, so attribute-based pricing, option-feature BOMs, approval hierarchies, and document templates are set through configuration rather than code. Custom logic needs are handled via a documented extension layer and REST APIs that survive standard upgrades.
Join UAE manufacturers who rely on VOIITS to synchronize planning, execution, and costing - aligned with Operation 300bn, ESMA ECAS/EQM, and ICV requirements.